Industrial Facility Due Diligence

Industrial facility phase II jobsite

Farallon managed and conducted a Phase I ESA and a Phase II Subsurface Investigation at a Seattle property consisting of six industrial buildings and surrounding storage yard areas. Site businesses included a sheet metal fabricator, an aircraft fabricator, and a heavy equipment transmission repair facility. Environmental conditions identified during the Phase I ESA included the unknown status of on-site USTs that had been used during historical operation of the property as a retail gasoline station and other industrial enterprises. Based on the Phase I ESA findings, Farallon conducted a Subsurface Investigation that identified TPH and metal impacts to soil and groundwater at the property.

Contact Us for More Information   
Get In Touch
Contact Us

Get In Touch







    This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.