Former Food Processing Facility
Cleanup Action/Underground Storage Tank Removal
Former Food Processing Facility, Seattle, Washington
Farallon managed the cleanup action at a former large food processing facility in Seattle, Washington. Prior to the cleanup, Farallon characterized the nature and extent of contamination from releases at six USTs and prepared a detailed Cleanup Action Plan describing the efficient cleanup process that would be performed concurrent with redevelopment of the city-block-size property.
The cleanup action involved:
1. Decommissioning of monitoring wells;
2. Permanent decommissioning by removal of six USTs;
3. Performance of a pre-excavation soil profile investigation;
4. Excavation and removal of soil with concentrations of petroleum hydrocarbons, BTEX, and/or PCE;
5. Sampling of water generated from dewatering during construction; and
6. Evaluation of groundwater conditions following excavation activities.
Nearly 18,000 tons of petroleum hydrocarbon-contaminated soil and over 5,000 tons of PCE-contaminated soil was profiled and managed
for off-site disposal during the cleanup action. Confirmation soil sample analytical results indicated that the potential risks to human health and the environment from exposure to contaminated soil were mitigated by the cleanup action. Because redevelopment activities resulted in removal of the upper portion of the water-bearing zone at the site, Farallon proposed to Ecology that confirmation groundwater monitoring was no longer applicable to meet state regulatory closure requirements. Ecology concurred with Farallon’s conclusions and issued a No Further Action determination for the site.